Westminster Abbey
A new lantern was fitted with a new vented timber substrate to avoid underside corrosion. We fitted new milled lead code 8 to the new

Wentworth Woodhouse
The old lead was not the correct size. Due to this, cracks and splits have appeared throughout the structure. To prevent underside corrosion, we stripped

Leeds Town Hall
In the original lead, there were cracks as it was oversized. We then completely stripped off the old lead. There were several areas where leaks

Hull Minster
We removed old lead taken and constructed a new vented timber substrate. We then installed sand cast lead following the correct specifications.

Castle Howard
The old lead was stripped off, and the new lead was installed. Several timber repairs were made where required, and new vented details have been

Brancepeth Castle
As a listed building with a grade 1 listing, the roof covering was incorrect (green mineral felt), and it was requested to restore the roof