Leeds Town Hall

In the original lead, there were cracks as it was oversized. We then completely stripped off the old lead. There were several areas where leaks had caused timber to rot, so we removed all affected areas and replaced them with new timber. As a result, we installed new milled code 8 lead according to the correct specifications. Our lead details have all been designed by ourselves in-house.